Green Buildings: Analysis of State of Knowledge

Green building practices emerged to mitigate the effects of the increasing impact on the environment and to improve the building construction process. In this context, a systematic  bibliometric analysis is provided. As a result, 124 articles were found in 40 internationally recognized scientific journals related to green buildings. A quantitative analysis is done to the  articles in order to know about the authors and countries with most publications; in addition to their evolution from 1980 to 2011. Then a qualitative analysis which aims to obtain the key aspects and obstacles to consider in Green Building and recommendations are given for each aspect. The goal of this paper is to provide building researchers and practitioners a better understanding of how to effectively make decisions to promote energy conservation and sustainability of green buildings. (link)

El uso de un proyecto como vínculo en los estudios de ingeniería

¿Cómo se podría mejorar la docencia de una ingeniería? ¿Es mejor un enfoque científico o profesional? ¿Cómo se pueden conjugar los enfoques más adecuados para que el aprendizaje sea efectivo? Son preguntas de respuesta compleja, pues depende mucho de las circunstancias y del perfil profesional al que vaya dirigido la pregunta.

En el caso del Máster Universitario en Planificación y Gestión en Ingeniería Civil (MAPGIC), se ha optado por un planteamiento que consideramos de gran interés. Se trata de hacer girar las asignaturas que constituyen el programa de posgrado en torno a un proyecto constructivo real. Esta idea, cuyo planteamiento es más sencillo de explicar que de aplicar, supone un gran esfuerzo del profesorado de coordinación. Las ventajas son más que evidentes. Si se elige un proyecto adecuado, el alumno es capaz de enlazar lo aprendido con un caso real. Pero mejor será dejar la comunicación que presentamos recientemente a la Conferencia INTED 2014 que se celebró en Valencia en el mes de marzo y que a continuación os paso.

SEGADO, S.; YEPES, V.; CATALÁ, J.; PELLICER, E. (2014). A portfolio approach to a M.Sc. degree in construction management using a common project. 8th International Technology, Education and Development Conference, INTED 2014, Valencia (Spain),  10-12 March,  pp. 2020-2029. 

Descargar (PDF, 449KB)

¿Cuántos actores existen en el proceso proyecto-construcción?

¿Todos los actores que intervienen en la gestión y materialización de un proyecto de construcción tienen relaciones fluidas? ¿Se entienden entre ellos? En post anteriores ya hablamos de los problemas de los proyectos, de los problemas de calidad y los despilfarros, de la norma ISO 10006 como vía para mejorar dichos problemas, e incluso de los problemas que presentan los propios recursos humanos en relación con la calidad. Hoy nos vamos a centrar en los actores de este proceso tan complejo. Seguro que de la lectura de las ideas que vienen a continuación se pueden sacar más conclusiones o debate. Os animo a ello.

Entre los actores que intervienen en la construcción de una obra de edificación o de ingeniería civil (promotor, propiedad, usuario final, etc.) destacamos cuatro cuyas relaciones van a determinar la posibilidad de establecer una gestión de proyectos según el espíritu recogido en las normas ISO 10006. Éstos son los siguientes: Continue reading “¿Cuántos actores existen en el proceso proyecto-construcción?”

Lecciones aprendidas en la optimización de estructuras de hormigón y la sostenibilidad

ACHE2014Hoy empieza el VI Congreso Internacional de Estructuras ACHE en Madrid. Es un buen momento para reflexionar sobre las lecciones aprendidas en optimización de estructuras de hormigón y su sostenibilidad. Son reflexiones fruto del trabajo de los últimos 8 años de investigación que permiten establecer algunas conclusiones que creo son de interés para los que nos dedicamos a la ingeniería civil, y en particular, a la investigación sobre el hormigón estructural y las infraestructuras en general.

Toda esta aventura empezó con la lectura de mi tesis doctoral, en el año 2002, sobre optimización de redes de transporte. Elegí este tema al ser profesor de la asignatura de Procedimientos de Construcción y estar interesado en profundizar en aspectos como el movimiento de tierras y la modelización del transporte. La realización de esta tesis me permitió adentrarme en un mundo desconocido para mí que era la optimización heurística y la inteligencia artificial. A pesar de las novedades que presentó la tesis y las publicaciones posteriores, me di cuenta que traspasar la frontera entre el mundo de las ideas a la realidad cotidiana del transporte suponía un reto de un alcance superior: la toma de decisiones en tiempo real en las rutas de distribución requería una actualización constante de gran cantidad de datos: tráfico, congestión, demanda de clientes, stocks, costes variables, etc. El problema no era la optimización, sino la gestión de cantidades masivas de datos que se actualizaban permanentemente.

Sin embargo en aquel entonces me di cuenta de las grandes posibilidades de utilizar estar herramientas en un campo que ha resultado fructífero: las estructuras de hormigón. En efecto, a partir del año 2003 empecé a impartir una asignatura de doctorado novedosa: “Optimización heurística en la ingeniería“, que posteriormente acabó en el Máster Universitario en Ingeniería del Hormigón llamándose “Optimización heurística de estructuras de hormigón”, de 3 créditos, y que ha acabado en una asignatura de mayor calado denominada “Modelos predictivos y optimización de estructuras de hormigón“, con 5 créditos. En este sentido, este año estamos terminando nuestro tercer proyecto de investigación competitivo del Ministerio de Ciencia e Innovación denominado HORSOSTDiseño eficiente de estructuras con hormigones no convencionales basados en criterios sostenibles multiobjetivo mediante el empleo de técnicas de minería de datos“.

.facebook_2096399093

Desde ese momento he tenido la oportunidad de dirigir tesis doctorales, publicar artículos científicos y presentar ponencias sobre este tema. Algunas de las consecuencias de todo este trabajo, donde ha participado un grupo de más de 15 investigadores, son las siguientes:

  1. Existe una posibilidad clara y real de usar las técnicas de optimización heurística en la optimización económica de estructuras de hormigón. Hemos encontrado muchos casos donde ahorros del 10 al 50% son fáciles de conseguir sin que exista ningún tipo de merma en la seguridad y prestaciones de las estructuras. Estas ventajas económicas son especialmente atractivas en el caso de elementos prefabricados repetitivos y en obras lineales de gran volumen.
  2. Estas técnicas permiten un diseño automatizado de la estructura. Es decir, no es necesario un diseño previo. Los algoritmos de optimización permiten reducir en un breve espacio de tiempo la experiencia adquirida por ingenieros a lo largo de los años, mejorando incluso sus diseños.
  3. La optimización debe incluir no sólo las cargas de la estructura en servicio, sino todo el proceso constructivo y su posible desmantelaje.
  4. Hay que tener un cuidado muy especial con el mal uso de las técnicas de optimización y del ordenador. Ello significa que dejar estos algoritmos a usuarios sin experiencia ingenieril es muy peligroso. La razón es la siguiente: las estructuras óptimas son significativamente más esbeltas. Si se comprueban los estados límite habituales es posible que cometamos errores. Por ejemplo, la optimización de muros de hormigón nos llevó a muros extraordinariamente esbeltos que flectaban enormemente en cabeza. Una limitación en la flecha de 1/150 evitó esta sensación de desplome. Este estado límite no lo suelen comprobar los programas habituales ni los calculistas. Otros estados límite que suelen ser relevantes son los de fatiga, vibración, pandeo, etc. Estas estructuras optimizadas empiezan a parecerse a las estructuras metálicas.
  5. Es muy posible que en breve espacio de tiempo las empresas que desarrollan software comercial introduzcan módulos de optimización en sus programas. Esto puede provocar la aparición de patologías inesperadas en las obras.
  6. Será necesario revisar las normativas actuales. Es muy posible que sea necesario un anexo en la futura EHE en la que se pongan cautelas en el diseñó automático de estructuras óptimas. Habrá que ser cuidadoso en la definición de los estados límite que se deban comprobar.
  7. Es un error optimizar sólo desde el punto de vista económico, debería realizarse análisis multiobjetivo considerando aspectos medioambientales, sociales y de otro tipo.
  8. La optimización abre un campo nuevo, que es la introducción efectiva de la sosteniblidad en el diseño de las estructuras. Si bien el anexo 13 de la EHE-2008 establece unos indicadores para medir la sostenibilidad medioambiental, se trata de una primera aproximación que no contempla la efectiva reducción de aspectos de gran interés: reducción de emisiones de CO2, reducción en el consumo energético necesario, reducción de la huella ecológica, reducción en el uso de materiales, etc.
  9. La reducción de los impactos ambientales se puede realizar actualmente basándose en bases de datos como la del BEDEC (Institut de Tecnologia de la Construcció de Catalunya) u otros similares. Sin embargo, estas bases de datos son actualmente de escaso alcance, con un grupo reducido de materiales y procesos constructivos, no contemplando el ciclo completo de vida de las estructuras, y por tanto debería realizarse un esfuerzo de primer nivel para su actualización y mejora.
  10. Es necesario realizar un esfuerzo importante (tenemos una tesis doctoral en marcha) para valorar la sostenibilidad social de las infraestructuras de la forma más objetiva posible. Este aspecto deber unirse a la sostenibilidad económica y medioambiental.
  11. Los análisis de optimización deben realizarse desde el punto de vista multiobjetivo. Se deben optimizar a la vez aspectos medioambientales, económicos, sociales, de funcionalidad, de seguridad, de durabilidad y otros. Ello significa que existe un área importante de investigación relacionada con la decisión multicriterio. Es decir, se debe dar un paso desde el conjunto de soluciones eficientes desde varios puntos de vista a la decisión final del decisor.
  12. Hay que realizar un esfuerzo de gran calibre para llevar estas técnicas de optimización pensando en el ciclo completo de las infraestructuras. En este sentido, estamos desarrollando también una tesis doctoral que trata de optimizar desde el punto de vista multicriterio el mantenimiento de las infraestructuras a lo largo de su ciclo de vida, considerando restricciones presupuestarias.

 

Mesa silla

También nos hemos dado cuenta de una serie de aspectos relacionados con nuestro trabajo, muchos de ellos no tan evidentes, que deberían divulgarse lo más posible para el uso adecuado de los recursos escasos de los que dispone nuestra sociedad:

  1. Los hormigones no convencionales (alta o muy alta resistencia, con fibras, autocompactante, con elevadas adiciones, etc.) proporcionan ventajas a tener muy en cuenta cuando se optimizan las estructuras. Por ejemplo, hemos visto cómo un material caro por su trabajabilidad como puede ser el hormigón con fibras, resulta competitivo desde el punto de vista económico frente a hormigones convencionales. Además, resulta interesante el comportamiento mecánico de las fibras cuando interactúa con la armadura activa del pretensado. Se necesita profundizar en el conocimiento de estos materiales para incluirlos en la optimización.
  2. También hemos comprobado que con incrementos mínimos en el coste (del orden del 1-3%) se puede duplicar o triplicar la durabilidad de las estructuras. Este aspecto es muy importante, pues permite una elevada amortización en los consumos, al alargar la vida útil. Creemos que se debe reformular en la EHE la vida útil de proyecto de las estructuras.
  3. Si bien la fabricación de cementos se ha considerado como un auténtico atentado respecto a la producción de emisiones de CO2, nuestros estudios han comprobado la eficacia de aspectos como la carbonatación y el reciclaje como sumideros de CO2. Debería profundizarse en este tipo de estudios para valorar de forma más precisa y realista los impactos que causa el hormigón cuando se contempla el ciclo de vida completo.
  4. La inteligencia artificial permite algo que, hasta ahora, era muy lento y poco efectivo: Se puede acelerar la obtención de experiencia y saber hacer en las estructuras. Así por ejemplo, generando bases ingentes de estructuras óptimas (digamos puentes pretensados con diversas luces), podríamos aplicar técnicas de minería de datos “data mining” para extraer de las bases de datos generadas información no trivial. Dicho de otra forma, se podrían avanzar fórmulas de predimensionamiento más efectivo que podrían usarse por parte de los calculistas e ingenieros en el diseño diario de sus estructuras. Esta práctica permitiría ahorros sustanciales, tanto económicos como medioambientales.
  5. Por último, insistir en la optimización a lo largo del ciclo de vida. Resulta especialmente importante en los tiempos que corren, tener muy claros los aspectos relacionados con el mantenimiento de las infraestructuras. Los estudios que estamos realizando indican que, incluso con presupuestos altamente restrictivos, es posible optimizar los indicadores de servicio de las infraestructuras si se actúa de forma inteligente.

Para terminar, por si puede ser de interés, os dejo alguno de los artículos más significativos que hemos desarrollado sobre estos temas. Espero que os sean útiles. De todas formas, nos vemos en el congreso ACHE.

  • MARTÍ, J.V.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2014). A memetic algorithm approach to designing of precast-prestressed concrete road bridges with steel fiber-reinforcement. Journal of Structural Engineering ASCE, (accepted, in press).
  • MARTÍ, J.V.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; LUZ, A. (2014). Diseño automático de tableros óptimos de puentes de carretera de vigas artesa prefabricadas mediante algoritmos meméticos híbridos. Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería, DOI: http://dx.doi.org/10.1016/j.rimni.2013.04.010.
  • TORRES-MACHÍ, C.; CHAMORRO, A.; VIDELA, C.; PELLICER, E.; YEPES, V. (2014). An iterative approach for the optimization of pavement maintenance management at the network level. The Scientific World Journal, Volume 2014, Article ID 524329, 11 pages, http://dx.doi.org/10.1155/2014/524329  (link)
  • GARCÍA-SEGURA, T.; YEPES, V.; MARTÍ, J.V.; ALCALÁ, J. (2014). Optimization of concrete I-beams using a new hybrid glowworm swarm algorithmLatin American Journal of Solids and Structures,  11(7):1190 – 1205. ISSN: 1679-7817. (link)
  • GARCÍA-SEGURA, T.; YEPES, V.; ALCALÁ, J. (2014). Life-cycle greenhouse gas emissions of blended cement concrete including carbonation and durability. The International Journal of Life Cycle Assessment, 19(1):3-12. DOI 10.1007/s11367-013-0614-0 (link)
  • MARTÍ-VARGAS, J.R.; FERRI, F.J.; YEPES, V. (2013). Prediction of the transfer length of prestressing strands with neural networksComputers and Concrete, 12(2):187-209. DOI: http://dx.doi.org/10.12989/cac.2013.12.2.187. ISSN: 1598-8198.
  • TORRES-MACHÍ, C.; YEPES, V.; ALCALA, J.; PELLICER, E. (2013). Optimization of high-performance concrete structures by variable neighborhood search. International Journal of Civil Engineering, 11(2):90-99 . ISSN: 1735-0522. (link)
  • MARTÍNEZ-MARTÍN, F.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A.; YEPES, V. (2013). A parametric study of optimum tall piers for railway bridge viaducts. Structural Engineering and Mechanics45(6): 723-740. (link)
  • MARTÍ, J.V.; GONZÁLEZ-VIDOSA, F.; YEPES, V.; ALCALÁ, J. (2013). Design of prestressed concrete precast road bridges with hybrid simulated annealing. Engineering Structures48:342-352. DOI:10.1016/j.engstruct.2012.09.014. ISSN: 0141-0296.(link)
  • CARBONELL, A.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2012). Automatic design of concrete vaults using iterated local search and extreme value estimationLatin American Journal of Solids and Structures, 9(6):675-689. ISSN: 1679-7817.  (link)
  • MARTINEZ-MARTIN, F.J.; GONZALEZ-VIDOSA, F.; HOSPITALER, A.; YEPES, V. (2012). Multi-objective optimization design of bridge piers with hybrid heuristic algorithms. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering, 13(6):420-432. DOI: 10.1631/jzus.A1100304. ISSN 1673-565X (Print); ISSN 1862-1775 (Online).  (link)
  • YEPES, V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J.; VILLALBA, P. (2012). CO2-Optimization Design of Reinforced Concrete Retaining Walls based on a VNS-Threshold Acceptance Strategy. Journal of Computing in Civil Engineering ASCE26 (3):378-386. DOI: 10.1061/(ASCE)CP.1943-5487.0000140. ISNN: 0887-3801. (link)
  • YEPES, V.; PELLICER, E.; ORTEGA, J.A. (2012). Designing a benchmark indicator for managerial competences in construction at the graduate level. Journal of Professional Issues in Engineering Education and Practice ASCE138(1): 48-54. ISSN: 1052-3928. DOI: 10.1061/(ASCE)EI.1943-5541.0000075.  (link)
  • CARBONELL, A.; YEPES, V.; GONZÁLEZ-VIDOSA, F. (2011). Búsqueda exhaustiva por entornos aplicada al diseño económico de bóvedas de hormigón armadoRevista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería, 27(3):227-235.  (link) [Global best local search applied to the economic design of reinforced concrete vauls]
  • CARBONELL, A.; GONZÁLEZ-VIDOSA, F.; YEPES, V. (2011). Heuristic optimization of reinforced concrete road vault underpasses. Advances in Engineering Software, 42(4): 151-159. ISSN: 0965-9978.  (link)
  • PEREA, C.; YEPES, V.; ALCALÁ, J.; HOSPITALER, A.; GONZÁLEZ-VIDOSA, F. (2010). A parametric study of optimum road frame bridges by threshold acceptance. Indian Journal of Engineering & Materials Sciences, 17(6):427-437. ISSN: 0971-4588.  (link)
  • PAYÁ-ZAFORTEZA, I.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A. (2010). On the Weibull cost estimation of building frames designed by simulated annealing. Meccanica45(5): 693-704. DOI 10.1007/s11012-010-9285-0. ISSN: 0025-6455. (link)
  • MARTÍNEZ, F.J.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A.; YEPES, V. (2010). Heuristic Optimization of RC Bridge Piers with Rectangular Hollow Sections. Computers & Structures, 88: 375-386. ISSN:0045-7949.  (link)
  • YEPES, V.; DÍAZ, J.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2009). Caracterización estadística de tableros pretensados para carreteras. Revista de la Construcción, 8(2):95-109. ISSN: 0717-7925. (link) [Statistical Characterization of Prestressed Concrete Road Bridge Decks].
  • PAYÁ-ZAFORTEZA, I.; YEPES, V.; HOSPITALER, A.; GONZÁLEZ-VIDOSA, F. (2009). CO2-Optimization of Reinforced Concrete  Frames by Simulated Annealing. Engineering Structures, 31(7): 1501-1508. ISSN: 0141-0296. (link)
  • YEPES, V.; ALCALÁ, J.; PEREA, C.; GONZÁLEZ-VIDOSA, F. (2008). A Parametric Study of Optimum Earth Retaining Walls by Simulated AnnealingEngineering Structures30(3): 821-830. ISSN: 0141-0296.  (link)
  • PEREA, C.; ALCALÁ, J.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A. (2008). Design of Reinforced Concrete Bridge Frames by Heuristic Optimization. Advances in Engineering Software, 39(8): 676-688. ISSN: 0965-9978.  (link)
  • PAYÁ, I.; YEPES, V.; GONZÁLEZ-VIDOSA, F.; HOSPITALER, A. (2008). Multiobjective Optimization of Reinforced Concrete Building Frames by Simulated Annealing. Computer-Aided Civil and Infrastructure Engineering, 23(8): 596-610. ISSN: 1093-9687.  (link)
  • YEPES, V.; MEDINA, J.R. (2006). Economic Heuristic Optimization for Heterogeneous Fleet VRPHESTW. Journal of Transportation Engineering, ASCE, 132(4): 303-311. (link)
  • PAYÁ, I.; YEPES, V.; CLEMENTE, J.J.; GONZÁLEZ-VIDOSA, F. (2006). Optimización heurística de pórticos de edificación de hormigón armado. Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería, 22(3): 241-259. [Heuristic optimization of reinforced concrete building frames]. (link)

¿Qué recursos necesitamos para ejecutar una tarea?

Toda actividad necesita recursos para ejecutarse. La programación de los recursos disponibles constituye un tema crucial para lograr que la obra esté finalizada en los plazos y costes establecidos. Consiste en asociar los recursos a sus tareas respectivas y ver cómo se ensamblan en el conjunto de la obra.

La limitación de recursos en la realización de una obra provoca conflictos que pueden resolverse mediante métodos de nivelación y de asignación. Los primeros laminan el diagrama de cargas sin producir retrasos en el plazo programado. Los métodos de asignación, por otra parte, pretenden que los recursos necesarios no superen los disponibles, pero con la condición de que el retraso provocado sea el mínimo posible. Con ayuda de las diversas técnicas de redes, se habrá establecido un camino crítico y unas holguras para cada una de las actividades. La prioridad en la asignación de los recursos será mayor cuanto menor sea la holgura disponible para cada una de las actividades.

Para aclarar este tema, os dejo un Polimedia de Alberto Palomares. Espero que os guste.

Referencias:

PELLICER, E.; YEPES, V. (2007). Gestión de recursos, en Martínez, G.; Pellicer, E. (ed.): Organización y gestión de proyectos y obras. Ed. McGraw-Hill. Madrid, pp. 13-44. ISBN: 978-84-481-5641-1. (link)

PELLICER, E.; YEPES, V.; TEIXEIRA, J.C.; MOURA, H.P.; CATALÁ, J. (2014). Construction Management. Wiley Blackwell, 316 pp. ISBN: 978-1-118-53957-6.

YEPES, V.; PELLICER, E. (2008). Resources Management, in Pellicer, E. et al.: Construction Management. Construction Managers’ Library Leonardo da Vinci: PL/06/B/F/PP/174014. Ed. Warsaw University of Technology, pp. 165-188. ISBN: 83-89780-48-8.

YEPES, V.; MARTÍ, J.V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2012). Técnicas de planificación y control de obras. Editorial de la Universitat Politècnica de València. Ref. 189. Valencia, 94 pp. Depósito Legal: V-423-2012.

¿Cómo se puede estimar la duración de una actividad?

El tiempo disponible para realizar cada tarea lo determinan las fechas en que se produce su inicio y su terminación. La duración de una actividad puede reducirse añadiendo recursos adicionales que, desgraciadamente, incrementan su coste. Existe la posibilidad de modificar los recursos asignados a cada tarea para ajustarse a las condiciones más convenientes, según las contingencias que se presenten durante la ejecución de la obra. Estos cambios producen una aceleración o deceleración en la realización de ciertas actividades con el consiguiente aumento o disminución de su coste directo. Se produce, por tanto, una correspondencia entre el coste directo de cada actividad y el tiempo invertido en su ejecución que proporciona la posibilidad de un ajuste costes-tiempos, adaptable a las necesidades de plazo o a la inversión económica del momento.

La duración “normal” de una tarea es aquella que minimiza su coste. En ocasiones, una programación basada en la duración normal puede prolongar excesivamente el trabajo, incrementando la repercusión de los gastos generales de la empresa en la obra. Del mismo modo, es probable exceder el plazo contractual si se programa exclusivamente con duraciones normales. En ambos casos, el jefe de obra tiene la posibilidad de reducir la duración de algunas o todas las actividades para disminuir el plazo total.

Otra aproximación a la estimación de la duración de las tareas es la que propugna el método PERT, y que ya tuvimos la ocasión de explicar en un artículo anterior. No obstante todo lo anterior, y para evitar una estimación “ad hoc” de las duraciones (es decir, la que más convenga), deberíamos fijar la duración de cada tarea en función de los recursos reales que tengamos para acometerlas. Esta práctica nos llevará a estimaciones realistas y deberíamos hacerla en el momento de la confección de la Estructura de Desglose de Trabajos.

Una pequeña introducción a estos conceptos la vamos a ver en el siguiente Polimedia de Alberto Palomares. Espero que os guste.

Referencias:

PELLICER, E.; YEPES, V. (2007). Gestión de recursos, en Martínez, G.; Pellicer, E. (ed.): Organización y gestión de proyectos y obras. Ed. McGraw-Hill. Madrid, pp. 13-44. ISBN: 978-84-481-5641-1. (link)

YEPES, V.; PELLICER, E. (2008). Resources Management, in Pellicer, E. et al.: Construction Management. Construction Managers’ Library Leonardo da Vinci: PL/06/B/F/PP/174014. Ed. Warsaw University of Technology, pp. 165-188. ISBN: 83-89780-48-8.

YEPES, V.; MARTÍ, J.V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2012). Técnicas de planificación y control de obras. Editorial de la Universitat Politècnica de València. Ref. 189. Valencia, 94 pp. Depósito Legal: V-423-2012.

YEPES, V. (2015). Coste, producción y mantenimiento de maquinaria para construcción. Editorial Universitat Politècnica de València, 155 pp. ISBN: 978-84-9048-301-5.

Licencia de Creative Commons
Esta obra está bajo una licencia de Creative Commons Reconocimiento-NoComercial-SinObraDerivada 4.0 Internacional.

¿Cómo podríamos diseñar un hotel con “calidad”?

Hotel Fábrica de Giner en Morella (Castellón)

En posts anteriores hemos destacado la importancia de la calidad de un proyecto de construcción, los costes de explotación y mantenimiento o del despilfarro en las obras. Aquí vamos a comentar algunos aspectos relacionados con una tipología concreta. Se trata de una infraestructura que, con mayor o menor fortuna, todos hemos utilizado, pero que menos han tenido la oportunidad de diseñar. Podemos, por tanto, realizarnos la siguiente pregunta: ¿qué es la calidad de diseño en un hotel? ¿Qué deberíamos hacer para que el proyecto de un hotel realmente tuviese en cuenta las necesidades de los clientes?

La calidad de diseño de un sistema hotelero se establecería a través de las siguientes fases:

  • Identificación de las necesidades de los distintos segmentos de mercado. No se debe proyectar un hotel como un edificio a imagen del arquitecto o del propietario, debe serlo a gusto del huésped buscado.
  • Elaborar un producto -instalaciones hoteleras- acorde a dichas necesidades, desarrollando las especificaciones de un proyecto factible, que lleven a la satisfacción de cliente -tanto interno como externo- y a la eficiencia económica. De las múltiples opciones se elegirá aquella que minimice los costes globales a lo largo de la vida del hotel. Técnicas como el “análisis del valor” deben desechar componentes del diseño que no proporcionen valor añadido al cliente. Esta implicación siempre obliga al estudio de varias soluciones alternativas. Continue reading “¿Cómo podríamos diseñar un hotel con “calidad”?”

Estructura del desglose del trabajo (WBS)

Usualmente, como primer paso de la planificación, se utiliza la técnica denominada “Estructura de Descomposición del Trabajo” (EDT) que permite dividir sucesivamente una obra en actividades con el fin de gestionarla adecuadamente. La EDT consiste en la identificación y la subdivisión jerárquica en tareas. El fraccionamiento sucesivo de la EDT se lleva a cabo en etapas que presentan un nivel de detalle cada vez mayor. El escalonamiento se visualiza en forma de diagrama de árbol; de este modo se reduce la complejidad de la obra al descomponerlo en conjuntos de actividades. Puede llegarse al nivel de descomposición que se estime más adecuado. El nivel más bajo de descomposición que define una actividad depende de factores tales como la tipología, la magnitud y la duración de la obra, la finalidad de la programación y los requisitos de control exigidos.


El propósito de una EDT es organizar y definir el alcance total aprobado del proyecto según lo declarado en la documentación vigente. Su forma jerárquica permite una fácil identificación de los elementos finales, llamados “Paquetes de Trabajo”. Se trata de un elemento exhaustivo en cuanto al alcance del proyecto, la EDT sirve como la base para la planificación del proyecto. Todo trabajo a ser hecho en el proyecto debe poder rastrear su origen en una o más entradas de la EDT.

Pero para que el concepto quede más claro, os dejo un Polimedia del profesor Alberto Palomares. Espero que os guste.

Os dejo algunos vídeos explicativos adicionales:

Referencias:

PELLICER, E.; YEPES, V. (2007). Gestión de recursos, en Martínez, G.; Pellicer, E. (ed.): Organización y gestión de proyectos y obras. Ed. McGraw-Hill. Madrid, pp. 13-44. ISBN: 978-84-481-5641-1. (link)

YEPES, V.; PELLICER, E. (2008). Resources Management, in Pellicer, E. et al.: Construction Management. Construction Managers’ Library Leonardo da Vinci: PL/06/B/F/PP/174014. Ed. Warsaw University of Technology, pp. 165-188. ISBN: 83-89780-48-8.

YEPES, V.; MARTÍ, J.V.; GONZÁLEZ-VIDOSA, F.; ALCALÁ, J. (2012). Técnicas de planificación y control de obras. Editorial de la Universitat Politècnica de València. Ref. 189. Valencia, 94 pp. Depósito Legal: V-423-2012.

Construction Management. Wiley Blackwell

Construction Management

Eugenio Pellicer, Víctor Yepes, José C. Teixeira, Helder P. Moura, Joaquín Catalá
ISBN: 978-1-118-53957-6
336 pages
November 2013, Wiley-Blackwell

Human beings build houses, roads, bridges, tunnels, ports, airports, factories, shopping centres, offices, warehouses, etc. Public and private organisations participate in the execution of these projects with the collaboration of architects, engineers, companies, financial entities, etc. The scope of the “construction” term includes the primary sector (quarries), secondary sector (equipment and construction materials) and tertiary sector (engineering and architecture consulting companies), that is, industrial, commercial and service activities. Therefore, it includes private initiatives and the activities of the public administrations.

Construction is set within a sensitive socio-political environment, affected by the need to protect the fundamental rights of persons, such as public health, homes, road safety, environmental integration, etc. It is easy to understand the problems in establishing a set of economic activities in an ordered and coherent framework, taking place in an environment with many players from various sectors , with conflicting interests and branches towards many other economic sectors. In a broader sense, construction is an important motor and, at times, an obstacle to economic growth.

In view of this scenario, this book is focused exclusively in the construction phase of that process. The contractor’s point of view is chosen, even though the links with the owner are always taken into account. An envisioned outline of the management at the construction site is looked for, from the signing of the contract to the beginning of the operational phase.

Aiming to develop a useful and applied text for students in post-graduate construction programmes, five authors work together. They all have a wide experience in the construction industry; in fact, this book is based on their previous experience in several Leonardo da Vinci projects financed by the European Union. Four of the authors develop their main task as professors in two different universities: Eugenio Pellicer, Víctor Yepes and Joaquín Catalá at the Universitat Politècnica de València, and José Teixeira at the Universidade do Minho; Helder Moura works for the Portuguese Highway Agency. Each author has led those chapters in which they can add more value to the work due to their professional and academic practice. Nevertheless, all of us have contributed to the whole. Continue reading “Construction Management. Wiley Blackwell”

Los problemas de calidad de los proyectos

¿Hasta qué punto los problemas de calidad en las obras se deben a deficiencias en los proyectos? En este post continuamos una serie de reflexiones relacionadas con la calidad, los proyectos y los recursos humanos. Nunca será suficiente resaltar la gran importancia de hacer buenos proyectos, y en este sentido aportamos aquí algunos datos que, con toda seguridad, se quedan cortos en relación al tema.

La siniestralidad de la construcción constituye un problema de gran importancia social y económica. Edificios con problemas estructurales, de impermeabilización o de fisuras; hundimientos de barrios enteros como consecuencia de la excavación de túneles subterráneos para el metro; líneas de ferrocarril de alta velocidad con problemas para alcanzar su velocidad comercial; presas que sufren roturas y provocan verdaderas catástrofes. Estos son algunos ejemplos que se pueden encontrar en la vida cotidiana y que suponen elevadísimos costes de todo tipo.

Varias estadísticas procedentes de diferentes países y realizadas por diversos organismos (Calavera, 1996) coinciden en señalar la elevada incidencia de los defectos producidos en la fase de proyecto y ejecución respecto a los materiales y al uso y mantenimiento de la construcción. En las Figuras 1 y 2 se recogen los resultados de un estudio estadístico de 10.000 informes de fallos del Bureau Seguritas (Francia), en 1978. Se comprueba que el coste de los errores en la fase de diseño se iguala a los de la ejecución de una construcción. Además, profundizando en la distribución de los fallos dentro de la propia etapa de proyecto, se evidencia la extraordinaria importancia de los detalles constructivos. Continue reading “Los problemas de calidad de los proyectos”